About Electric Vehicle Charging Unit Installation

General News
Type General News
Publication Date 16 July 2026, 11:36
Installation of the electric vehicle charging unit is subject to certain procedures in line with the procedures and principles determined by the General Directorate of Energy Affairs of the Ministry of Energy and Natural Resources.
Installation process; It varies depending on the type of building (detached building or site/apartment) and purpose of use (individual or shared use).
Please review the explanations below and follow the application process appropriate for you.

Things to Know Before Application

• All installations must be made in accordance with the current electrical legislation.
• The suitability of the existing electrical installation is evaluated before installation.
• If deemed necessary, the distribution company may request additional information and documents.
• Project planning should only be carried out by authorized persons.

1. Charging Unit Installation in Detached Buildings

In detached houses, charging unit installation can be done through the existing electricity subscription.

Application Process

1. The project is prepared by an authorized electrician.
The necessary renovation and/or power increase project for the existing electrical installation is prepared; Relevant applications are made through the online application system and the process is followed.
2. Electrical installation is checked.
The prepared project and application are evaluated by the distribution company. If the installation is found suitable, the approval process is completed and power increase operations are carried out.
3. The charging unit is installed.
Installation is carried out in accordance with the current electrical legislation.
✅ After the installation is completed, the charging unit is ready for use.

2. Charging Unit Installation in Sites and Apartments

Since common areas in sites and apartments are considered within the scope of the Condominium Law, the installation process is different.
Individual Installation
In accordance with the current legislation and application principles, charging units cannot be installed in common areas on behalf of individual users. For this reason, it is not possible to install a charging unit directly in the common area on behalf of the individual user.

3. Common Use Charging Unit Installation

The following procedures must be carried out in order to install a charging unit for common use.
1. Step 
In order to install a charging unit in the common area, a decision must be taken by ensuring the necessary share and stakeholder majority in line with the provisions of the Condominium Law.
2. Step
The project regarding the common area electrical installation is prepared by authorized persons. Within the scope of the prepared project, the necessary applications are made through the online application system and the process is followed.
3. Step 
The prepared project and application are evaluated by the distribution company. If the installation is found suitable, the approval process is completed and the charging station subscription to the common area is carried out.
4. Step
The installation is completed in accordance with the current legislation and the charging unit is put into use.